Congestion is building at key Northern European ports, with shipping lines and logistics operators bracing for mounting schedule disruptions in the coming weeks.
Ports such as Antwerp-Bruges and Bremerhaven are emerging as significant bottlenecks in the region, with operational slowdowns and vessel backlogs already impacting cargo flows.
41% of vessels at Antwerp are currently waiting for a berth, and an additional 52 containerships are en route to the Belgian hub. At Bremerhaven, 29% of vessels are waiting, with 27 ships inbound, signalling a widening congestion issue across the network.
The seven-day average vessel waiting time has climbed to approximately 1.81 days, with key indicators pointing to escalating terminal pressure.
In response to mounting congestion, Antwerp has reduced the export cargo delivery window from seven to five days, a move aimed at improving cargo flow and easing terminal strain. However, efforts to clear the backlog are still being hampered by the lingering effects of a March 31st strike.
Further compounding the situation are low water levels across inland waterways, limiting barge transport capacity, and reduced labour availability.
With no immediate resolution in sight, carriers are advising to prepare for potential delays as Northern Europe’s gateway ports head into one of their most challenging periods of the year.
The Caledonian Freight team are always eager to assist, for further information on the above please do not hesitate to get in touch with us.






